POLE OF NAVACCHIO

During the expansion of the Technological Pole of Navacchio an underground tank that had contained diesel traction was discovered. Biglia ltd has performed the digging operations for the removal of the underground tank and environmental monitoring for checking presence / absence of contamination of soil and groundwater. On completion of the operation, the excavation was filled with soil certificate. Biglia ltd managed the described processes, monitoring, administrative practices and has performed the risk analysis specific-site.