Categories: Projects

Lucca

LUCCA Biglia ltd was responsible for the design, construction and installation of a stripping plant for treating water containing chlorinated compounds and design, construction and installation of a Pump & Treat plant for the treatment of groundwater.

Cervinia

CERVINIA Following accidental spill from a tank containing diesel fuel, Biglia ltd stepped in to design, build and install a drainage system. It was built a drainage barrier with conveyance of water under ground. The waters, through a collection system, are then sent to a...

Piombino Harbor

PIOMBINO HARBOR During the fuel oil transfer operations from the quay to the ship, it occurred the accidental spillage of a significant amount of fuel oil. The emergency team intervened and immediately bordered the intervention area and used adsorbent powder specific for hydrocarbons. Through the...

Pole of Navacchio

POLE OF NAVACCHIO During the expansion of the Technological Pole of Navacchio an underground tank that had contained diesel traction was discovered. Biglia ltd has performed the digging operations for the removal of the underground tank and environmental monitoring for checking presence / absence of...

Fire Department

FIRE DEPARTMENT Commissioning intervention of environmental emergency service linked to road accidents and truck rollover of the Fire Department, so Biglia ltd performed the emergency and restore operations of environmental matrices and administrative practices as provided for by Legislative Decree 81/06. The emergency team intervened...